For General Contractors

STOP EATING CHANGE ORDERS

Change orders are the tax you pay for building blind. Walk the exact corridor widths, ceiling heights, and finishes in 3D—and lock the owner's sign-off—before you ever break ground. Kill the expectation-vs-reality gap that drives rework.

180×
Faster
54×
Cheaper
Day 1
Owner Aligned
Live Budget · Day 1 ZIP 43206
Total Estimated Cost
$1,900,000
Construction$1,540,000
FF&E$240,000
Fees$120,000
Swap a quality tier → 3D finish and cost update instantly.
The GC's Reality

The Change-Order Tax

Misalignment hides inside flat 2D plans until it surfaces mid-construction—as change orders, rework, and blown schedules, at the most expensive possible moment to fix it:

01

Hire an Architect

$100k+ sunk before a single number is validated.

02

Wait Months

Schematic design crawls forward on assumptions.

03

Send Out for Bids

Contractors finally price the drawings.

04

Bids Come Back $XM Over

Total misalignment between vision and budget.

05

Value-Engineer / Re-bid

Degrade the project or fire the contractor.

06

Start Over

Back to step one—time and capital gone.

A tale of dead deals, cost overruns & missed deadlines.

The Shift

A New First Phase

Pre-Pre-Construction inserts one decisive step at the very front of the timeline—before design, bidding, or construction—so every phase after it inherits perfect alignment.

Pre-Pre-ConstructionThe Alignment Formula
Schematic Design
Design Development
Bidding
Construction

Establish alignment on spatial design and hard financial realities on Day 1.

Built to Kill Change Orders

See It Before You Build It

Three ways The Alignment Formula protects your margin and your schedule:

Walk It in 3D

1st-person mode shows exact corridor widths and ceiling heights—killing the expectation-vs-reality gap.

$

Localized Trade Pricing

Real hourly rates for plumbers, electricians, masons, and carpenters in the project's ZIP.

Owner Sign-Off on Day 1

The owner approves the exact building—in 3D—before you ever break ground.

Design + Budget, fused in real time.

Category of One

Our Only Competition Is a Spreadsheet & a Napkin Sketch

There is no other software for this phase—because this phase didn't exist as a category until now. Here's what changes when you own Day 1:

 
Traditional
Pre-Pre-Construction
Phase Initiated
After months of design
Day 1
Cost of Entry
$100k+ sunk costs
Low SaaS fee
Time to Budget
Months
Minutes
Visual Output
Abstract 2D plans
Live 3D & 4D walkthroughs
Stakeholder Alignment
Fragmented / flying blind
Total, unified alignment

Built on a patented object-attribute engine (US Patent 12086948 B2). Change one spatial attribute—ceiling height, a room's finish tier—and labor, materials, and cost ripple instantly.

Version 1.0 · Now Available

BUILD IT ONCE.

Align the owner and lock the budget before you break ground—in a single session.

Schedule a Demo

Interested in investing in the future of construction?

Learn More